久久久精品免费视频-99re在线视频-曰韩三级-亚洲毛片视频-日韩电影av-四虎看片

網站公告-NOTICE
聯系我們
濟南航豐實業有限公司

電話:15168870138
聯系人:龐經理

網址:http://m.euup.cn  

廠址: 德州市禹城市莒鎮產業園26棟

經銷商地址:天橋區建華五金市場東區5-1  

魯ICP備09095923號-1

新聞資訊

當前位置:首頁 / 新聞資訊

電纜橋架在施工時如何確定鋼管位置

電纜橋架施工時,施工職員進入現場一定要戴好帽,遇有高空操作,應事先搭好腳手架并將帶系于牢靠處。橋架及支架除承受自重和電纜荷重外,不得承受其他附加載荷,不答應將電纜托架及支架作為支承固定其他裝置或作起重物的金屬構架。
During the construction of cable bridge, the construction staff must wear safety helmet when entering the site. In case of high-altitude operation, the scaffold shall be set up in advance and the safety belt shall be tied to the firm place. In addition to bearing the dead weight and cable load, the cable tray and bracket shall not bear other additional loads. It is not allowed to use the cable tray and bracket as the metal frame for supporting and fixing other devices or lifting objects.
電纜橋架
Cable tray
安裝時不能將橋架當作腳手架使用,并避免施工職員在橋架上攀登或站立工作。橋架嚴禁作為職員通道嚴禁在橋架上休息玩鬧。立柱焊接應牢固防止承載后跌落。橋架堆放應整潔留有可供職員行走的通道,在電纜夾層內進行橋架施工時,熱控橋架及保護管安裝照明光線應充足。
During installation, the bridge should not be used as scaffold, and the construction staff should not climb or stand on the bridge. The bridge is not allowed to be used as a passageway for staff. It is strictly forbidden to rest and play on the bridge. The column shall be welded firmly to prevent falling after bearing. The bridge should be stacked neatly, leaving a passage for staff to walk. When the bridge construction is carried out in the cable interlayer, the lighting for the installation of thermal control bridge and protection pipe should be sufficient.
嚴禁在土建構筑物上擅自打洞如確實施工需要必需按有關細則的劃定進行工作。施工中如遇垂直交叉功課必需有可靠隔離措施,否則必需避開。橋架在工作過程中嚴禁相互打鬧、拋擲各種物品,遇有違章或行為應立刻指出并制止。
It is strictly forbidden to drill holes on civil structures without authorization. If construction needs to be carried out, the work must be carried out according to the relevant rules. In case of vertical crossing in construction, reliable isolation measures must be taken, otherwise, it must be avoided. It is strictly forbidden to fight with each other and throw all kinds of articles during the working process of bridge. In case of any violation or behavior, it shall be pointed out and stopped immediately.
橋架使用的工具及設備材料應擺放整潔,嚴禁占用通道施工過程中應采取相應的防護措施。施工結束后,應清理好現場做到“工完、料盡、場地清”。焊接時焊條頭不得亂丟同一回收處理。施工中產生的邊角廢物由工地同一回收處理。施工照明不得有“長明燈”現象盡量減少電的消耗。這樣就達到了電纜橋架施工及環境保護措施。
The tools, equipment and materials used in the bridge should be placed neatly, and it is forbidden to occupy the passage. Corresponding protective measures should be taken during the construction. After the completion of construction, the site shall be cleaned up to achieve the goal of "completion of construction, material exhaustion and site cleaning". During welding, the welding rod head shall not be discarded and recycled. The corner waste generated during construction shall be recovered and treated by the same site. Construction lighting shall not have the phenomenon of "permanent lighting" to reduce the power consumption as far as possible. In this way, the safety construction and environmental protection measures of cable bridge are achieved.
以上就是對電纜橋架施工時確定鋼管位置的方法介紹,以及安裝方法,相信通過本文的描述,你能有所收獲,希望以上內容能對你有所幫助。
The above is the cable tray construction to determine the location of the steel pipe introduction, and installation methods, I believe that through the description of this article, you can get something, I hope the above content can help you.
 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 色悠久久久久综合网伊人男男 | 模特精品一区二区三区 | 免费一级毛片麻豆精品 | 国产精品亚洲精品一区二区三区 | 欧美视频xxxxx | 日本红怡院在线 | 最新国产精品自拍 | 在线视频 中文字幕 | 免费视频99| 国产欧美一区二区日本加勒比 | 婷婷的久久五月综合先锋影音 | 日本成人免费在线视频 | 韩国一级片视频 | 中日韩精品视频在线观看 | 中文国产成人精品久久一 | 中文字幕乱码系列免费 | 日韩美女在线看免费观看 | 午夜国产精品不卡在线观看 | 国内精品久久久久久影院老狼 | 欧美专区视频 | 国产女厕偷窥系列在线视频 | 毛片网站观看 | 国产精品视频免费 | 久久999精品| 草草影院免费 | 中文字幕在线视频网 | 免费观看欧美一级高清 | 窝窝午夜看片七次郎青草视频 | 久久精品成人一区二区三区 | 日韩字幕一中文在线综合 | 亚洲人成综合网站在线 | 久久精品国产一区二区三区日韩 | 免费看一级做a爰片久久 | 国产自愉自愉全免费高清 | 日本亚欧乱色视频在线网站 | 91九色精品国产免费 | 成人一级黄色毛片 | 免费国产99久久久香蕉 | 日本一区二区不卡久久入口 | 国产一区影视 | 国产视频二 |