安裝鋁合金橋架容易出現哪些問題?

鋁合金橋架在安裝的時候需要考慮到電纜的走向以及細節處理問題,而且供與電纜安裝的橋架種類各式各樣,每種電纜橋架也有著不同的安裝特點。

When installing aluminum alloy cable trays, it is necessary to consider the direction and details of the cables, and there are various types of cable trays available for cable installation, each with different installation characteristics.

1.接地跨接線在橋架兩側隨意安裝或漏跨接,接地跨接線不設在顯眼側。接地跨接線的線鼻與爪形墊片壓接順序裝反,有的未設爪形墊片,鍍鋅橋架接地螺栓未有防松墊圈。

1. Grounding jumper wires should be installed or omitted on both sides of the bridge, and should not be placed on the conspicuous side. The crimping sequence of the wire nose and claw washer of the grounding jumper is reversed, and some do not have claw washers. The grounding bolts of the galvanized bridge do not have anti loosening washers. 

2.電纜橋架與托架間未固定,橋架支架未做接地跨接線,穿越防火分區未做防火封堵。

20180426013833374.png

2. The cable tray and bracket are not fixed, the tray support is not grounded, and there is no fireproof sealing when passing through the fire compartment.

3.鋁合金橋架與鋼支架間未做防電化腐蝕的絕緣處理。橋架彎頭、三通等不使用與橋架配套的成品配件,而是現場加工制作,加工質量不符合規范要求。

3. The aluminum alloy bridge and steel bracket have not been insulated to prevent electrochemical corrosion. Bridge bends, tees, and other accessories that are not matched with the bridge are not used, but are processed and manufactured on site, and the processing quality does not meet the standard requirements.

4.螺桿吊架安裝橋架時,未按規范要求設置防晃支架,鋼支架未按防腐要求施工。

When installing the cable tray with screw hangers, anti sway brackets were not set up according to the specifications, and the steel brackets were not constructed according to anti-corrosion requirements.

5.金屬電纜橋架及其支架全長沒做可靠接地,未按規范要求設置伸縮節。

5. The entire length of the metal cable tray and its support has not been reliably grounded, and expansion joints have not been installed according to the specifications.

6.吊頂內托盤、槽式橋架蓋板漏蓋。橋架連接板的固定螺栓的螺母裝在橋架內側,橋架和配電箱、柜及接出或接入的鋼管等未做接地連接。

6. The tray and trough type bridge cover plate inside the ceiling are missing. The nuts of the fixing bolts of the bridge connecting plate are installed on the inside of the bridge, and the bridge, distribution box, cabinet, and steel pipes connected or connected are not grounded.

本文由山東電纜橋架提供技術支持,更多精彩內容請繼續關注我們的http://m.euup.cn,我們后續會有更多精彩內容給您展現.

This article is supported by Shandong cable tray technology. For more exciting content, please continue to follow us http://m.euup.cn We will have more exciting content to showcase to you in the future

 
qq
售前咨詢熱線
15168870138
售后咨詢熱線
13465410318
主站蜘蛛池模板: 亚洲天堂一区二区在线观看 | 国产一级毛片卡 | 国产激情久久久久影 | 日本成a人伦片 | 人久热欧美在线观看量量 | 国产精品久久久久毛片 | 久久综合婷婷 | 久久久久18 | 亚洲高清一区二区三区 | 亚洲网址在线观看 | 国产在线91精品入口首页 | 一级一黄在线观看视频免费 | 在线高清一级欧美精品 | 艳女伦交一级毛片 | 亚洲国产欧美一区二区欧美 | 高清在线亚洲精品国产二区 | 中文字幕人成乱码在线观看 | 国产精品久久久久影院色 | 男人和女人的做刺激性视频 | 一本色道久久88综合亚洲精品高清 | 美女午夜影院 | 目韩一区二区三区系列片丶 | 中文字幕成人免费高清在线 | 欧美综合亚洲 | 久爱免费观看在线网站 | 新版天堂资源中文8在线 | 欧美在线播放成人a | 又黄又骚 | 久久亚洲国产的中文 | 欧美一区二区三区在线观看免费 | 一级毛片视频免费观看 | 日韩精品中文字幕一区二区三区 | 久久一区二区精品 | 97国产在线视频公开免费 | 欧美亚洲日本韩国一级毛片 | 成人毛片在线播放 | 久久综合九九亚洲一区 | 成人 在线欧美亚洲 | 亚洲图片偷拍自拍 | 美女被免费网站视频软件 | 亚洲精品无码不卡 |